Brick Paver Installation & Edging



Staging of material

A lot of paver projects will differ depending on gain access to, site conditions, task size and of course, the weather. Mindful consideration must be taken to determine the time to start the paver installation.

The supervisor or project supervisor should always have the materials (sand/ pavers) dispersed around the job website for simple and efficient installations. Paver pallets/bundles need to be placed in a way not to hinder the paver installation. The proper pallet/bundle placement can make the real project installation simpler and quicker by lowering the overall labor of handling the material.

Brick paver patterns

Pavers can be positioned in many different patterns depending on their shape. Each paver shape will usually have several various hatch patterns that are supplied by the manufacturer.

Professionals require to take into consideration the traffic weight loads on their paver projects. In a lot of applications around the world, it has been shown that pavers laid in a herringbone pattern have actually carried out sufficiently.

Pavers that are 60 mm (2 - 3/8 in) density are suitable for pedestrian applications. Pavers that are going to be utilized in commercial or business applications should be 80 mm (3 - 1/8 in) in thickness.

Reference/starting point for brick paver installation

There are a variety of conditions that figure out the starting point of a paver job.

When beginning to set up pavers it is best to snap a real straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface area of the bed linen sand at the ended up elevation of the pavers This will assist as a guide for preserving straight joint lines and will likewise permit the installer to make adjustments in the alignment of the pavers.

Structures and concrete suppressing are usually not straight and should not be used for developing straight joint lines. The use of string lines is important to figure out the true straightness of the edge. As the paver installation advances, the string lines will help decrease the need for small trim pieces.

Joint width between pavers need to be between 1/16 and 3/16 in (2 and 5 mm ). There are some pavers with spacer bars on their sides. These will maintain a minimum joint width and enable the bed linen and jointing sand to get in between each paver. Pavers with spacer bars are normally not laid in snug against each other because a string line will provide consistent joint spacing.

Installation of brick pavers.

Among the most widely used methods for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have pulled or above the bedding sand. This will give you a true and straight line off which to work. Once this row is developed, you can continue to work outward into the field with the remainder of the pavers. Constantly make certain to periodically examine your joint lines to make sure they are real and straight. If not, adjustments to the pavers can be made as you continue installing. Pavers should be installed hand tight. The best approach is to position a paver versus another one and let it move down into the bedding sand. Do not kick or tap the pavers into place as this can throw your lines out of true straightness.

When installing pavers on a steep grade, they ought to be set up at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

On big business and industrial applications, hand laying pavers would not be cost effective due to the labor intensity. The best method for setting up pavers on large jobs is to install them mechanically. Using a mechanical laying device can install approximately 6000 - 7000 sq ft a day. There are a couple items a professional need to think about prior to setting up pavers mechanically:

1.) Mechanical installers are just capable of installing pavers in certain patterns.

2.) The contractor must make certain that the maker can production and bundling pavers in the preferred pattern on the pallets for easy mechanical installation.

Poor color mixing might result in a patchy looking installation. A lot of producers are consistent with color mixing on each package of pavers, but it is South Florida Pavers the contractor's duty to make sure appropriate blending in the field.

Cutting procedures for brick pavers.

Professionals generally have 2 methods of cutting pavers. When cutting pavers wet, it will assist lessen dust and will prolong the diamond blades life. The operator of the brick saw need to constantly cut the pavers away from the surface of the paver field when cutting damp, due to the truth that the pavers will create a slurry that will stain the paver surface area.

The brick saw operator must always use the appropriate protection that is required for operating a saw, such as eye, ear, breathing and hand security ).

Edging types

Edge restraints play a major function in the overall success of an interlocking pavement installation Edging restraints remove lateral movement of the pavers and hold the pavers securely together. Specifically at the outer border of the paver application, without an edging restraint, your job is guaranteed to stop working in time.

There are numerous various edging restraints from which professionals can choose. Usually manufactured edge restraints are the most frequently utilized by professionals. Manufactured edging restraints can vary from, plastic edging, steel and aluminum, timbers or precast concrete and stone. An edging type that is used mostly in commercial and industrial applications is poured-in-place concrete curbs. This edging restraint is usually set up by other professionals.

Edging installation.

When installing your edge restraint, it ought to rest straight on top of the compacted gravel base. The compacted gravel base course should extend a minimum of 6in beyond the border of the pavers This will offer a proper foundation upon which the edging restraint can sit. Produced edging (i.E. Plastic, steel or aluminum) should be securely anchored into the compacted gravel base( talk to the manufacturer's literature for the suggested spacing of the spikes). There are some edging restraints that will extend much deeper into the gravel base or beyond the base course (i.E. Timbers or poured-in-place curbs ). Edging restraints ought to never ever be placed straight on top of the bedding sand. This might lead to the migration of the bedding sand and ultimate lateral movement of the pavers. Geo textile fabric is advised if there is a possibility of losing bedding sand between the pavers and the edge restraint. When a space between the pavers and the edging surpasses 3/8" (10mm), then the area ought to be filled with cut pavers. All edging applications need to be properly back filled after they are set up to help offer extra stability.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The whole area that is to be compressed need to be swept clean of any foreign items and particles that can cause scratching or scuffing on the surface of the pavers.

In addition, it is crucial that the very first compaction takes place before any jointing sand has actually been used to the pavers. If jointing sand is applied to the pavers prior to compaction takes location, this can cause a bridging problem and will not enable the joints to be entirely filled with jointing sand. This can likewise prevent the pavers from being correctly set into the bed linen sand.

When condensing the pavers, it is advised that you make at least two passes in various instructions throughout the pavers. This will allow the pavers to be correctly set in the bed linen sand and will require the bed linen sand up into the joints from the bottom of the pavers.

The compaction of the pavers is very crucial to the final efficiency of the pavers. Failure to do correct compaction can lead to deformations and pavement failure over time.


Paver pallets/bundles ought to be put in a way not to interfere with the paver installation. One of the most extensively used methods for the installation of pavers is hand installation of each paver. The operator of the brick saw ought to always cut the pavers away from the surface area of the paver field when cutting damp, due to the fact that the pavers will produce a slurry that will stain the paver surface area. Edging restraints eliminate lateral movement of the pavers and hold the pavers firmly together. When a space in between the pavers and the edging goes beyond 3/8" (10mm), then the area ought to be filled with cut pavers.